The e.Mix Model in practice: the complete guide

What the e.Mix Model is, how the 6 steps of structured implementation work and why operations that follow the method sustain results for years, not just weeks.

Share
The e.Mix Model in practice: the complete guide

Most SaaS vendors deliver the system and disappear. Go-live becomes the finish line, and in the following months the operation discovers it bought a tool nobody uses the right way. The spreadsheet comes back. The analyst goes back to manual follow-up. The manager goes back to answering status questions in the S&OP meeting.

That isn’t a system failure. It’s a model failure: a system without a methodology and without people who sustain adoption doesn’t deliver results. It delivers one more tool to feed.

FollowNet One is e.Mix’s foreign trade software. But FollowNet One on its own isn’t what sets e.Mix apart in the market. What sets it apart is the e.Mix Model: System + Methodology + Team that lives your operation, a structured approach that starts before go-live and doesn’t end with it. This guide explains what the e.Mix Model is, how it works in practice and why operations that follow it sustain results for years, not weeks.

  • → The problem: a system implemented without a methodology becomes one more tool to feed by hand
  • → The cost and risk: low adoption, a return to the old process, investment with no visible ROI
  • → The mechanism: 6 steps of structured implementation + continuous improvement with a PDCA cycle + a team certified in Lean Six Sigma
  • → How to start: one critical trade lane, focused configuration, visible results in 30 days, not in 18 months

What the e.Mix Model is

The e.Mix Model is how e.Mix structures the implementation, adoption and continuous evolution of FollowNet One at each customer. It isn’t an onboarding manual: it’s a complete methodology, based on PDCA, Lean Six Sigma and process mapping, that starts at the kick-off and evolves every month.

Three pillars support the method:

  1. System: FollowNet One configured for the operation’s real profile: trade lanes, partners, criticality, integrations. Not a standard installation, but a configuration that reflects what the operation needs.
  2. Methodology: 6 structured implementation steps, with a schedule, defined key people, certified training and a follow-up routine. Go-live isn’t the end; it’s the start of the continuous improvement cycle.
  3. A team that lives your operation: an e.Mix team certified in project methodologies (PSM, PMP) and process mapping (Lean Six Sigma). Not just technical support, but professionals who understand foreign trade operations and solve problems together with the customer.
DimensionStandard market SaaSe.Mix Model
After go-liveTechnical support for questionsMonthly follow-up of results and continuous improvement
ConfigurationStandard: the same for every customerBased on the operation’s profile: trade lanes, partners, criticality
AdoptionThe customer’s responsibilityManaged by the e.Mix team with cadence and evidence
EvolutionNew versions of the systemMonthly PDCA cycle: review, adjust, expand
ResultsDepend on the customer’s internal maturityStructured and measured from the kick-off

The 6 steps of the implementation process

Implementation under the e.Mix Model happens in six structured steps, each with a clear deliverable, a defined owner and a completion criterion:

  1. Plan: kick-off and schedule. Project presentation, definition of the key people, high-level schedule and release of the system’s initial base.
  2. Configure: mapping and setup. Mapping of the current scenario, configuration of services and integrations based on the operation’s real profile.
  3. Train: training and certification. Training for users, administrators and key users, with knowledge certification.
  4. Follow up: adoption follow-up. Monitoring of usage and of the improvements implemented, with adoption indicators by trade lane.
  5. Close: results presentation. Presentation of expected versus achieved gains, final sign-off and introduction of the customer success team.
  6. Improve: continuous improvement. Periodic reassessment of the implemented process, identification of opportunities and adjustments. The process starts over with each cycle.

Why operations with the e.Mix Model sustain results for years

The short-term results (less manual follow-up, alerts working, S&OP with data in hand) show up in the first weeks. But what separates operations that sustain those results for years from those that go back to the old model is structured continuous improvement.

Every month, the customer success team presents the savings achieved and identifies what can be improved to increase the result the following month. The system doesn’t stay frozen in the go-live configuration: it evolves with the operation, taking in new trade lanes, new partners and new exception rules.

This cycle is what e.Mix calls “driving the Ferrari with all its features”. The tool has the capacity; the method makes sure the operation learns to use it progressively.

Proof from the field: System + Methodology + Team that lives your operation

Before: Manual activities, more people for basic tasks, individual lookups for each status.

After: The information comes to the analyst; they don’t have to go to the screen. Fewer people producing more, because the methodology points to what needs attention.

Eloi Filho, Customs Clearance Director, LOX Shipping
Video (in Portuguese): https://www.youtube.com/watch?v=X21pnGZIyqg&t=149s

How the e.Mix Model works in practice: the first 90 days

The first 90 days follow a wave logic: each wave adds a trade lane or a feature, calibrates the results and prepares the next cycle. It isn’t everything at once; it’s progressive, with a measurable result at each stage.

Days 1–30 (first wave): configuration of the trade lane with the highest volume or the highest historical cost, training of the key users, first alerts live. KPI: percentage of shipments with status updated in the last 24 hours.

Days 31–60 (calibration): review of the alerts based on what happened in the first month, adjustment of criteria, expansion to the second trade lane. KPI: number of alerts resolved within the SLA.

Days 61–90 (expansion): third trade lane or second transport mode, integration with additional partners, a consolidated weekly exceptions routine. KPI: estimated monthly savings versus the baseline.

How to set up the e.Mix Model without an endless project

Owner: Foreign Trade Manager or Coordinator, responsible for making sure the key people take part in the training and that the exception dashboard is reviewed daily.

Cadence: daily, reviewing the exception dashboard before the workday starts; monthly, reviewing the savings with the customer success team and defining the next improvement cycle.

Traffic-light KPI: monthly savings: less demurrage, less emergency freight and fewer hours of manual follow-up. Presented by the e.Mix team every month, compared with the previous month’s baseline.

First scope: the trade lane with the highest volume or the highest historical cost. One 30-day wave. Visible results before expanding.

Questions & Answers

What is the e.Mix Model?

The e.Mix Model is e.Mix's approach to implementation and continuous improvement: System + Methodology + Team that lives your operation. It combines FollowNet One configured for the operation's real profile, 6 structured implementation steps based on PDCA and Lean Six Sigma, and a certified team that follows the results every month, not just at go-live.

Why doesn't go-live deliver results on its own?

Because a system without a methodology and without adoption follow-up becomes one more tool to feed by hand. Go-live configures the system, but what makes sure the team uses it correctly, that the alerts are calibrated and that results are measured every month is the methodology and the continuous improvement cycle that comes afterwards.

What are the 6 implementation steps of the e.Mix Model?

Plan (kick-off and schedule), Configure (mapping and setup of the operation), Train (certification of users and key users), Follow up (adoption follow-up and improvements), Close (results presentation and sign-off) and Improve (monthly continuous improvement cycle). The sixth step restarts the cycle: the implementation never ends; it evolves.

What is e.Mix's continuous improvement cycle?

It's the monthly process that takes place after go-live: the customer success team presents the savings achieved that month, identifies improvement opportunities and defines the next cycle. Each cycle expands trade lanes, adjusts alert criteria and increases the savings. It's based on PDCA: plan, do, check, act.

How long does it take to see results with the e.Mix Model?

The first results show up in the first 30 days: less manual follow-up, alerts working, the exception dashboard live on the initial trade lane. Measurable financial savings (less demurrage, less emergency freight, fewer hours of rework) are presented in the report for the first month of continuous improvement. Expansion to the other trade lanes happens progressively.

What are key users in the e.Mix Model?

Key users are the customer's employees who receive in-depth training and certification in FollowNet One. They're the internal point of reference: they train new colleagues, answer day-to-day operational questions and secure adoption without depending on the e.Mix team for every interaction. Key user certification is what sustains long-term adoption.

How is the e.Mix Model different from other SaaS vendors?

Most SaaS vendors deliver the system and hand adoption over to the customer. The e.Mix Model keeps the customer success team active after go-live, with monthly savings follow-up, configuration reviews and a continuous improvement cycle. The difference isn't the system; it's what happens after go-live.

Does the e.Mix Model work for any size of operation?

Yes. The wave approach (start with one trade lane, calibrate, expand) lets operations of any size start with a controlled scope and scale progressively. Smaller operations start with 1 trade lane and 30 days of configuration. Larger operations expand in multiple waves, with each cycle adding complexity in a structured way.

What do savings mean in the context of the e.Mix Model?

Savings are the measurable reduction in avoidable cost generated by implementing FollowNet One with the e.Mix Model. They include less demurrage and detention thanks to free time alerts, less emergency freight thanks to anticipating deviations, and fewer hours of manual follow-up and rework. The customer success team presents the savings every month, compared with the baseline before implementation.

What happens if the team doesn't adopt the system after go-live?

Low adoption is the most common problem in SaaS implementations, and the e.Mix Model was designed to prevent it. Adoption follow-up (Step 4) monitors usage indicators by trade lane and by user. When adoption is below expectations, the e.Mix team identifies the root cause (inadequate configuration, insufficient training or an unmapped process) and fixes it before the customer goes back to spreadsheets.

How to implement the e.Mix Model in foreign trade

A practical guide to structuring the implementation of FollowNet One with the 6 steps of the e.Mix Model, securing sustained adoption and measurable results, not just go-live. Applies to importers, exporters, manufacturers, freight forwarders and customs brokerage firms.

  1. 1

    Step 1: Kick-off and schedule

    Project presentation, definition of the customer's key people (owner manager, key users, operations team) and preparation of the high-level schedule. Release of FollowNet One's initial base with standard settings so the team can start getting familiar with it.

  2. 2

    Step 2: Mapping and configuration of the operation

    Mapping of the current scenario: trade lanes, partners, volumes, criticality and existing integrations. Configuration of FollowNet One based on the operation's real profile, not a generic standard. Definition of the alert criteria for the first trade lane.

  3. 3

    Step 3: Training and certification of key users

    Training for operational users, administrators and key users. Knowledge certification: the key user needs to be able to train new colleagues and resolve operational questions without depending on the e.Mix team day to day.

  4. 4

    Step 4: Adoption follow-up and improvements

    Monitoring of adoption indicators by trade lane and by user. Identification of needed adjustments: configuration, alert criteria or an unmapped process. In this phase, adoption isn't the customer's responsibility: it's actively managed by the e.Mix team.

  5. 5

    Steps 5 and 6: Closing and continuous improvement

    Presentation of expected versus achieved gains, final sign-off and start of the monthly continuous improvement cycle. Every month: savings review, identification of opportunities, expansion to new trade lanes or partners. The process never ends; it evolves with the operation.

Proof See clients talk about this topic, with name, company and the exact video clip. →

The e.Mix Model doesn't end at go-live: it starts there. A monthly continuous improvement cycle with the customer success team, measured savings and progressive evolution of the operation. Request a 30-minute demo.